> Aircraft Hangar Erection Procedure
The images below will take you through the main steps of assembling a 20.4m (66.9ft) Span x 28m (91.8ft) Long EFASS with a
Trident Door each Gable End.
Unloading container.
Layout of spans.
Setup using two teams for speed build.
Preparing for first module lift.
Lifting second module.
Preparing door spans for cover installation.
Positioning covers in their protective bags, ready for installation.
Pulling covers between modules.
Preparing covers for lifting operation.
First stage lift of door.
Second stage lift of door.
Finished building with one door open.